Pathlight VX Site Preparation Guide 27
Planning to Install and Configure Pathlight VX
This chapter contains information-gathering tasks related to installing and configuring the Pathlight VX at
the customer site. The Pre-Sales Engineer and, in some cases, the Key Account Program Manager
(KAPM), should use these tables to document the installation information gathered during the design phase
with the customer. The information can then be available to the resources assigned to the Installation tasks
so that the deployment is executed as designed.
Record all requested information. For the responsibilities of ADIC personnel and sub-contractors, shipping
and receiving details, and specific site installation requirements, refer to the Statement of Work (SOW). The
SOW should be included in the documents provided by the Installation Coordinator as received by the Pre-
Sales Team when architecting the Pathlight VX.
Planning for Pathlight VX Installation and Configuration
Make sure that the tasks listed in Table 19 have been completed.
Table 19 Planning for Pathlight VX Installation and Configuration
Task Description Page
1 Gathering Configuration Information for Virtual Libraries
.29
2 Gathering Configuration Information for FC Port Parameters.31
3 Gathering Configuration Information for FC Host Parameters.32
4 Gathering Configuration Information for Virtual and Physical Media.38
5 Review Pathlight VX Advanced Features.41