Quantum Pathlight VX User's Guide Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
Pathlight VX Site Preparation Guide 13
Gathering Systems Assurance Information
This chapter specifies systems assurance information that must be gathered before the Pathlight VX is
installed. Systems assurance information includes environment, power, rack, tool, and networking
requirements that must be met to successfully install a Pathlight VX at the customer site. Either the Pre-
Sales Engineer or the Key Account Program Manager (KAPM) should gather this information and verify that
the requirements have been met when surveying the customer site.
This chapter consists of the following sections:
Verifying Configuration Information
on page 14
Site Readiness Checklist
on page 16
Verifying Tool Requirements
on page 23
Planning for Networking Requirements
on page 24