16 Gathering Systems Assurance Information
Site Readiness Checklist
Table 5 lists tasks that must be completed to prepare the customer site for the Pathlight VX installation. Best
practice is to verify that these things are available before the Installation Engineer appears on site.
Table 5 Site Readiness Checklist
Readiness Question
Are the environmental requirements met and ready for the installation? Refer to Verifying
Environmental Requirements on page 17.
Are the power requirements met and ready for the installation? Refer to Verifying Power
Requirements on page 18.
Are the rack requirements met and ready for the installation? Refer to Verifying Power
Connections and Rack Requirements on page 19.
Are the network requirements met and ready for the installation? Refer to Planning for
Networking Requirements on page 24.
Is the browser used supported by Pathlight VX? Refer to Supported Browser Versions on
page 24.
Is the installation location within a 100 mile radius of an EMC Service Center? Refer to
the PVX Service Plan document at this location: https//csweb01hq.adic.com/manuals/
pvx_man.htm.
Are the weight and spacing requirements met and ready for the installation?
Are there any special shipping instructions? For example, does an ADIC engineer need
to be scheduled for delivery of the unit (the library will not fit through a door while it is in
the crate, there is no loading dock, there is no room to store the unit until it can be
uncrated, etc.).
Record special shipping instructions: