Quantum Pathlight VX User's Guide Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
Pathlight VX Site Preparation Guide 11
44 Physical Library eVPS
LUN Mapping for
Libraries with a SNC
on page 53
45 Physical Library eVPS
LUN Mapping for
Libraries with IOBs on
page 55
46 Send all
documentation to the
Install Coordinator
Pre-Sales
E-mail Install
Coordinator
Upon completion of each section, the
worksheet should be sent to the
Installation Coordinator at
A master copy will then be stored on
CS Web for other ADIC TMs who are
involved with the site preparation and
installation. The completed
information is stored by customer,
location, and serial number on an
internal file server.
47 Install SR Number Install
Coordinator
All preceding information must be
available in order to create the Install
SR.
48 EMC Contact Install
Coordinator
Name:
Phone:
E-mail:
49 EMC Entitlement
Complete
Install
Coordinator
The process performed by ADIC staff
that ensures the system is registered
for service and support from EMC.
The worksheet collects information
such as site contact information,
DPE serial numbers, IP addresses,
modem (Y/N), and the start date for
the service contract.
50 Actual Install Date
Complete
Installing SE Date:
Hours:
Trips:
Date the Install was completed,
Hours spent onsite performing the
install and number of trips required.
51 Successful Install Installing SE
Please indicate if it was a successful
Install, and if not please describe
what issues impacted the install.
52 Test Backup
Performed
Installing SE
Please indicate if you were able to
run a backup in the customer's
environment to verify the entire
configuration. If not, please indicate
any remaining open items to
complete the backup environment.
Step Milestone/Name Task Owner
Information and
Notes
Instructions
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 71 72

Comments to this Manuals

No comments